A box full of grease

After another very productive weekend of work on Ike, I’m just about ready to assemble the front axle. Nearly all of the parts are here, and everything I have has been blasted and painted. The last few things I need are the spindles that I had previously had but put on the parts Jeep thinking they had the wrong bushings (turns out I had the right ones from the beginning) and the brake lines for the front axle that will be easier to install before it’s hanging from the frame. Unfortunately, I ordered the brake lines late, so hopefully they’ll…

1 Comment

Short week

Due to some other obligations, today was the only day this weekend that I’ll be able to do any work on the Jeep. Luckily, I got some good stuff done with the short time I had. First off, I got the long axle shaft down to the driveline place to get the joint replaced. The new part won’t be in for a few days, so I’ll have to wait until next weekend or so to get that back. After dropping it off, I got the rest of the front axle parts prepped for their first coat of paint. I got…

Comments closed

Rzeppa setbacks

After another weekend of work, I’m getting fairly close to having a rolling chassis in my garage. This weekend was all about getting the pieces for my front axle prepped for paint and final assembly. This meant sandblasting, sandblasting, and more sandblasting. I got the rest of the brake parts blasted and ready (both backing plates, drums, and lower connecting plate), the hubs completed, and the differential cover blasted and cleaned. I’ll have to go back and get the spindles that I swapped out when I did the axle shaft removal from the parts Jeep though, since the correct bushing…

Comments closed